Dam Bulkhead Placement & Conduit Repairs Abiquiu Dam, NM (USACE)

Procurement
USACE, Albuquerque, NM
Project Type
Renovation / Repair
Location
Abiquiu Dam, New Mexico
Total Cost
$5,050,324
Work consisted of:
Dive inspections of the existing lake.
Conduit/liner paint removal and painting.
Gate lead paint.
Bulkhead replacement/water diversion and bulkhead modification.
Cleaning of bulkhead slots (high pressure water blasting).
Loading bulkheads onto barge and underwater installation of bulkheads.