TACLAN Renovation
The project objective included an upgrade to an existing 2242sf TACLAN room to meet ICD 705 requirements for Open Storage classification and be capable of housing and running up to 15 TACLAN servers simultaneously.
Work included:
Cooling capacity increase of HVAC
The number of circuits increased in the room
Installation of a new transformer & upgrading the existing transformer
Extend walls up to roof deck
Installation of Intrusion Detection System
Entry door replacement with STC 45 SCIF door assembly,
Wire mesh cages to secure equipment and incidental related work.